Electricity, being a vital part of our day-to-day life, is a utility that everyone needs access to. The Hyderabad Electric Supply Company, abbreviated as HESCO, is a leading electricity distribution company in Pakistan, serving various areas of Sindh Province, including Hyderabad. If you’re looking to apply for a new electric connection from HESCO, the following step-by-step guide will help you navigate through the process.

Pre-Application Requirements

Before applying for a new HESCO connection, you’ll need to collect certain documents:

  1. A copy of your National Identity Card (NIC).
  2. Proof of ownership of premises (e.g., a copy of your house registry, allotment letter, or lease agreement).
  3. Two recent passport-sized photographs.
  4. If you’re a tenant, a No Objection Certificate (NOC) from the property owner is required.

The Application Process

Step 1: Collect the Application Form

The application form for a new HESCO connection can be obtained from your nearest HESCO office. or download the form below.

Step 2: Complete the Application Form

Fill out the application form with all the necessary information. This will include your full name, residential address, contact details, and details of your premises. You will also need to specify the type of connection you’re applying for – residential, commercial, industrial, or agricultural.

Step 3: Submit the Form and Necessary Documents

Once you’ve completed the application form, submit it to your local HESCO office along with all the necessary documents mentioned above. You will also be required to pay a non-refundable application fee.

Step 4: Site Inspection

Once your application is received, a HESCO official will visit the site for an inspection. This is to verify the information provided in your application and to assess the technical feasibility of providing the electric connection.

Step 5: Payment of Demand Notice

If the site inspection is successful and your application is approved, you’ll receive a demand notice from HESCO. This notice will detail the charges for the new connection, which may include security deposit, service line charges, and meter charges. You will need to pay these charges at the designated bank branches within the specified time.

Step 6: Installation of the Connection

After the payment is made and verified, HESCO will schedule the installation of your new electric connection. This process includes laying down the necessary cables and installing the electric meter.

Post-Installation

Once your new connection is installed, HESCO will provide you with a unique consumer number. This number will be used for all future correspondences, including bill payments and complaint registration.

Things to Keep in Mind

  • The time frame for getting a new connection can vary, typically ranging from a few weeks to a couple of months, depending on several factors like the load requirement, infrastructure availability, and location.
  • Make sure to obtain a receipt for every payment you make during this process.
  • Always provide accurate information and truthful documents to avoid any legal issues.

In conclusion, applying for a new connection from HESCO is a relatively straightforward process that involves filling out an application, submitting documents, paying fees, and awaiting site inspection and installation. Always remember to follow all the steps correctly and keep copies of all documents and receipts for future reference.